Name |
: |
Barabhum Irrigation Scheme |
|
Purpose (Irrigation or Multipurpose) |
: |
Irrigation |
|
Type (Major / Medium / Minor) |
: |
Medium |
|
Basin |
: |
Ganga |
|
Sub-basin |
: |
Kangsabati |
|
River |
: |
Kerro |
|
Year of approval (By State Govt.) |
: |
1976 |
|
Year of commencement |
: |
1975-76 |
|
Year of completion |
: |
1978 |
|
Approved cost |
: |
343 Lakh |
|
Actual cost |
: |
343 Lakh |
|
Districts benefited |
: |
Purulia |
|
Cultivable command area |
: |
2.024 Th Ha |
|
Ultimate Irrigation potential |
: |
2.728 Th Ha |
|
Irrigation potential created |
: |
2.728 Th Ha |
|
Max. Irrigation potential utilized |
: |
2.583 Th Ha |
|
Name of dam |
: |
Barabhum Dam |
|
Location of dam |
: |
23° 1'51.78"N, 86°18'22.31"E, Barabazar, Purulia |
|
Type of dam |
: |
Earthen Dam with Spillway |
|
Length of dam |
: |
856.09 m. |
|
Nos. of spillway gates |
: |
4 (R ) |
|
Catchment area (upto Dam) |
: |
102.81 Sq Km |
|
Submergence area of reservoir |
: |
2.53 Sq Km |
|
Design discharge of Spillway |
: |
544.40 Cumec |
|
Max. flood level |
: |
|
|
Full reservoir level |
: |
225.00 m |
|
Gross storage capacity |
: |
8.385 MCM |
|
Live storage capacity |
: |
6.045 MCM |
|
Nos. of head regulators |
: |
2 Nos. |
|
Canal discharge |
: |
LBMC : 3.073 Cumec , RBMC : 0.505 Cumec |
|
Length of main canals |
: |
LBMC : 12.344 Km , RBMC : 5.334 Km |
|
Length of distribution system |
: |
LBMC : 7.0409 Km. |
|
Total no. of structures |
: |
72 Nos. |